Proceeding 28876  Register

Applications 28876-A001, 28876-A002, 28876-A003 and 28876-A004

Commencement of virtual hearing: January 13, 2025 at 10 a.m. 

Watch an AUC hearing

Overview

The Alberta Utilities Commission will be holding a hearing to review applications for electric transmission development. The Commission previously issued a notice of hearing in this proceeding on August 16, 2024, for Nova Solar G.P. Inc.’s transmission connection components. The Commission has since received related applications from AltaLink Management Ltd. and has combined AltaLink’s applications with Nova Solar’s application.

Nova Solar has applied to construct and temporarily operate a new eight-kilometre-long, 240-kilovolt transmission line, to be designated as Transmission Line 927AL, near the town of Carseland. The new transmission line would connect the approved Nova Solar Power Plant to the Alberta Interconnected Electric System through Nova Solar’s approved Nova 1005S Substation.

AltaLink Management Ltd. has applied for approval to connect existing Transmission Line 927L to proposed Transmission Line 927AL and to alter Transmission Line 927AL to accommodate this proposed connection. AltaLink has also applied to install one new telecommunications tower (up to 29 metres tall) at the Nova 1005S Substation.

The map included with this notice identifies the applied-for routes by Nova Solar.

Hearing Information

The Commission will host a virtual oral hearing, commencing on January 13, 2025, at 10 a.m.

To learn more about the review process, or for more information about how you may become involved in this proceeding, please contact us or visit the following webpages:

Summarized process schedule

The AUC has established the following process to consider the applications:

Process step Date
Participation closing date October 10, 2024
Interveners’ information requests (questions) to applicants (Nova Solar G.P. Inc. and/or AltaLink Management Ltd.) deadline October 21, 2024
Applicants’ deadline to respond to information requests October 31, 2024
Interveners’ written evidence deadline November 12, 2024
Information requests to interveners about intervener evidence November 25, 2024
Interveners’ deadline to respond to information requests December 6, 2024
Applicants’ reply evidence deadline December 16, 2024
Test session January 3, 2025, 2 p.m.
Commencement of hearing January 13, 2025, 10 a.m.

​The eFiling System​

The eFiling System should be accessed to view the applications and the other documents the AUC will be considering in this proceeding. The system is also used to file submissions and evidence to participate in the proceeding.

To create an account, select “New account” and follow the steps to create a user ID and password. If you have any questions about how to use the eFiling System please contact us at info@auc.ab.ca or 310-4AUC.

Documents being considered in this proceeding can be found in the eFiling​ System (which requires log in). Once you have logged in, enter 28876 in the “go to” section at the top left corner of your screen.

Nova Solar Power Connection Project