Proceeding 29312  Register

Applications 29312-A001 and 29312-A002

Commencement of virtual hearing: To be determined

 

Watch an AUC hearing

Overview

The AUC will be considering the power plant development applications in Proceeding 29312.

Rising Sun Inc. has applied for approval to construct and operate a 125-megawatt solar power plant designated as the Rising Sun Solar Project and the 1147S Rising Sun Substation. The power plant and substation would be sited on 261.5 hectares of cultivated land, located approximately 12 kilometres west of Provost, Alberta, in the north half of Section 10 and 11, in Township 39, Range 4, west of the Fourth Meridian. The applications have been filed under the Hydro and Electric Energy Act.

 

Hearing Information

To learn more about the review process, or for more information about how you may become involved in this proceeding, please contact us or visit the following webpages:


The eFiling System​

The eFiling System should be accessed to view the applications and the other documents the AUC will be considering in this proceeding. The system is also used to file submissions and evidence to participate in the proceeding.

To create an account, select “New account” and follow the steps to create a user ID and password. If you have any questions about how to use the eFiling System please contact us at info@auc.ab.ca or 310-4AUC.

Documents being considered in this proceeding can be found in the eFiling​ System (which requires log in). Once you have logged in, enter 29312 in the “go to” section at the top left corner of your screen.

Rising Sun Solar Project