Proceeding 28728  Register 

Applications 28728-A001 to 28728-A002

Watch an AUC hearing

Overview

Spruce Grove 1 Solar STL Inc. applied to construct and operate the 23.5-megawatt Spruce Grove South Solar PV Plant and to connect it to the FortisAlberta Inc. distribution system. The power plant would be located in Parkland County, approximately 14 kilometres south of Spruce Grove, as shown in the map below. The applications have been filed under the Hydro and Electric Energy Act. 

This proceeding was placed into abeyance on October 29, 2024.

Further information about the proceeding is available through the AUC’s eFiling System under Proceeding 28728.

The eFiling System​

The eFiling System should be accessed to view the applications and the other documents the AUC will be considering in this proceeding. The system is also used to file submissions and evidence to participate in the proceeding.

To create an account, select “New account” and follow the steps to create a user ID and password. If you have any questions about how to use the system please contact us at info@auc.ab.ca or 310-4AUC.

Documents being considered in this proceeding can be found in the eFiling​ System (which requires log in). Once you have logged in, enter 28728 in the “go to” section at the top left corner of your screen.​

Spruce Grove South Solar PV Plant