The AUC’s electronic filing tool used to manage, search and upload application documents
Rules that set out requirements and processes for all entities under the AUC’s jurisdiction
Full list of all recently issued regulatory documents
Legislation regulating the energy and utilities sector
Current electricity and gas rates in Alberta
How the AUC reviews and determines utility rates
Resources for questions and general concerns involving regulated utilities
Answers to common utility related questions
Highlighting a few projects and applications currently being reviewed and considered
General information about creating an account and using the eFiling System
A list of active registered applications being considered
What is involved in reviewing power generation facilities in Alberta
Established process to review applications
Livestream broadcast of AUC hearings
Engage in a consultation
Resources for participating in an AUC hearing process
A trusted leader that delivers innovative and efficient regulatory solutions for Alberta
Your source for AUC news, bulletins and announcements
Electric, gas, water utilities and renewable power generation
Stories of innovative regulatory solutions for Albertans and happenings at the AUC
The AUC is reviewing applications for transmission development in the Medicine Hat area
Decision: 26707-D01-2022, issued November 23, 2022
Watch an AUC hearing
The AUC has approved applications from Enerfin Energy Company of Canada Inc. to construct and operate the 122.32-megawatt Winnifred Wind Power Plant Connection Project and the associated substation, designated as Holsom 1054S Substation.
On June 28, 2021, the Commission approved the needs identification document application filed by the Alberta Electric System Operator (AESO), which proposed a single-circuit, 138-kilovolt (kV) transmission line to connect Enerfin’s Holsom 1054S Substation to AltaLink’s Bullshead 523S Substation and to upgrade the Bullshead 523S Substation. As directed by the AESO, Enerfin and AltaLink filed facility applications requesting approval from the Commission to meet the identified need.
The Commission issued a ruling on September 28, 2022, and issued a notice of hearing cancellation to cancel the oral hearing and establishing a new process schedule for the filing of written submissions. The ruling is available on Proceeding 26707 as Exhibit 26707-X0292.
The eFiling System should be accessed to view the applications and the other documents the AUC will be considering in this proceeding. The system is also used to file submissions and evidence to participate in the proceeding.
To create an account, select “New account” and follow the steps to create a user ID and password. If you have any questions about how to use the system please contact us at info@auc.ab.ca or 310-4AUC.
Documents being considered in this proceeding can be found in the eFiling System (which requires log in). Once you have logged in, enter 26707 in the “go to” section at the top left corner of your screen.
This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.