Acceptance Testing

Rule 024 (effective April 1, 2026)

​Rule 024: Rules Respecting Micro-Generation [PDF]

Rule 024 sets out the requirements that must be met before constructing and interconnecting a micro-generation unit to the distribution grid. It also sets out a process for disputes between micro-generation customers and the applicable wire owner regarding the costs to connect to the grid. ​

Related information

Previous versions of this rule and related bulletins can be found in the consultation documents library. Sort by topic (Rule 024​) and by document type to find the information you are looking for.