​​​Rule 007: Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations, Hydro Developments and Gas Utility Pipelines

Related information
​Rule

Rule 007 Wiki page
Rule 007: Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations, Hydro Developments​ and Gas Utility Pipelines [PDF version]
Rule 007 interim information requirements [PDF]

Effective date

March 28, 2024

Description

​Rule 007 sets out application requirements for the construction, alteration, operation, and the discontinuation, dismantling and removal of power plants, substations, transmission lines, industrial system designations, hydro developments and gas utility pipelines as well as approvals of a needs identification document.​​

Forms
Reference

Roles and responsibilities of the AUC and Alberta Environment and Parks for applications to construct and operate wind and solar power plants.

​Related brochure

Please contact us at webmaster@auc.ab.ca if you would like us to send you a printed copy or printed copies of the Participating in the AUC’s independent review process to consider facility applications brochure.

Previous versions

Previous versions of this rule and related bulletins can be found in the consultations library. Sort by topic (Rule 007​) and by document type to find the information you are looking for.